worker gained’t report his hours accurately
A reader writes:
At my small firm, workers have a small variety of set hours every week however can set their very own schedule to be as full or as empty as they’d like by scheduling periods instantly with the purchasers they’re linked with. We give them a calendar the place they enter their hours labored, after which we course of payroll primarily based on these calendars twice a month. The calendars are the one manner we all know something about folks’s work schedules, as they will change drastically from week to week.
A brand new worker for some cause simply is not going to fill out his calendar in something approaching a well timed method. He has been right here for months, and up to now I’ve been capable of course of his hours with everybody else’s as soon as. Aside from that one time, he has fully ignored his calendar (and all of my emails) for about 1.5 months, then backfills all of it and expects to be paid for all that point.
Apart from how unusual that is, it creates a large headache for me as I’ve to do particular payroll runs for this one particular person. Our payroll system is time-intensive and much from my main obligation, and I’m at my wits’ finish. Do you could have any ideas for what I can do or tips on how to get this to cease?
I reply this query — and three others — over at Inc. at present, the place I’m revisiting letters which have been buried within the archives right here from years in the past (and generally updating/increasing my solutions to them). You can learn it right here.
Different questions I’m answering there at present embody:
- My workplace contains me in Administrative Professionals Day simply because I’m a lady
- Reference checker solely needed me to name if the candidate was “distinctive”
- How far again ought to your resume go?